Project Description

OWNER: CITY OF CLEVELAND

PROJECT COST/VALUE: $12.3M

QCS FEE:  $583,505

ROLE: Construction Engineering/Construction Management/Construction Inspection

PROJECT DURATION: July 2019 – September 2023

QCS STAFF & SERVICES PERFORMED:          

  • Matt Piascik (Project/Construction Engineer)
  • Keith Jones (Structures Inspector/Concrete Testing)
  • Mike Constiner (Structures Inspector/Concrete Testing)
  • Jeff Zaucha (Coatings Inspector)

SERVICES PERFORMED:

  • Project/Construction Engineering for the following: new lift bridge construction including installation and operation of mechanical/hydraulic system
  • Structures Inspection for the following: new lift bridge construction including pile foundations; abutment construction; placement of structural steel; construction of a control building; utility installation and relocation; installation of lighting
  • Coatings Inspection for painting of structural steel
  • Concrete QA Testing for all concrete placed on the project

SCOPE: Construction of a new pedestrian lift bridge between Voinovich Bicentennial Park and the Great Lakes Science Center.

PROJECT DESCRIPTION: This $12.2M project consisted of the construction of a new moveable bascule pedestrian bridge over the boat passageway from the North Coast Harbor between Voinovich Bicentennial Park and the Great Lakes Science Center. The new bridge has a span length of 120 feet with two 60 foot movable sections. The moveable bridge is powered by a hydraulic operating system that is controlled in a new, stand-alone structure. The new building provides a bridge operator workspace in a safe, conditioned workspace. During the construction of the bridge abutments, cofferdams were utilized and provided a water tight work environment. In addition, barge work was required for multiple portions of the project. Once installed, the bridge was highlighted with aesthetic and navigation lighting.